![]() | ||||||||||||||||||
![]() | ||||||||||||||||||
![]() | ![]() | ![]() | ||||||||||||||||
![]() | ||||||||||||||||||
![]() | ![]() | ![]() | ||||||||||||||||
![]() | Bethel School District: Working with general contractor, BNBuilders and Bassetti Architects, Metro Glass Company installed storefront and windows for two pre-engineered metal buildings (a 24,563-square-foot central kitchen and a two-story, 34,060-square-foot transportation maintenance building) for the Bethel School District in Fredrickson, WA.
Hamlin Robinson School: Metro, working with general contractor, Kirtley Cole and Associates, installed aluminum storefronts and windows in this school for children with dyslexia and other language based learning difficulties. | ![]() | ||||||||||||||||
![]() | ||||||||||||||||||
![]() | ![]() | ![]() | ||||||||||||||||
![]() | ||||||||||||||||||
![]() | ||||||||||||||||||
![]() | ![]() | ![]() | ||||||||||||||||
![]() | ||||||||||||||||||
![]() | ![]() | ![]() | ||||||||||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |